Energy Activities and Projects

Current and Past Projects since 2019

Equipment

  • Replace Plant Air Compressors in Building 420
  • Replace Plant Air Compressors #1 and #3 in Building 207
  • Replace Chillers in Building 303
  • Replace Chiller #2 in Building 320
  • Replace Boiler #1 in Building 421
  • Replace AHU’s (14) in Building 220, 411, 103, and 102
  • Replace Boiler #1 in Building 207
  • Replace AHU’s (14) in Building 220, 411, 103, and 102

Lighting

  • Replace Light Fixtures with LED in Building 103
  • Replace Light Fixtures in Building 130 – Cell M
  • Replace Light Fixtures with LED in Building 114
  • Replace Light Fixtures with LED in Building 115
  • Replace Light Fixtures with LED in Building 110
  • Replace Parking Lot Lights with LED
  • Replace Lighting Controllers for Building 101, 102, an 103

Water

  • Repair Fire Water Line and replace SCV’s and PIV’s
  • Repair Fire Water Tower and Controller
  • Install New Water Meters