Current and Past Projects since 2019
Equipment
- Replace Plant Air Compressors in Building 420
- Replace Plant Air Compressors #1 and #3 in Building 207
- Replace Chillers in Building 303
- Replace Chiller #2 in Building 320
- Replace Boiler #1 in Building 421
- Replace AHU’s (14) in Building 220, 411, 103, and 102
- Replace Boiler #1 in Building 207
- Replace AHU’s (14) in Building 220, 411, 103, and 102
Lighting
- Replace Light Fixtures with LED in Building 103
- Replace Light Fixtures in Building 130 – Cell M
- Replace Light Fixtures with LED in Building 114
- Replace Light Fixtures with LED in Building 115
- Replace Light Fixtures with LED in Building 110
- Replace Parking Lot Lights with LED
- Replace Lighting Controllers for Building 101, 102, an 103
Water
- Repair Fire Water Line and replace SCV’s and PIV’s
- Repair Fire Water Tower and Controller
- Install New Water Meters