Work continues the Mirror Ground Support Equipment (MGSE) upgrades at the XRCF. Preparations continue for the XRCF optical axis Metrology Demonstration Test (MDT-1) with Kratos this month. Preliminary checkouts were performed on-site with Kratos personnel present to prepare for MDT-1.